V klasickom batériovom zväzku s prietokovou konštrukciou má plstená elektróda významný podiel na pokles tlaku v zväzku. Na simuláciu prietoku týmito elektródami je potrebná konštanta permeability. Toto číslo je materiálovou konštantou, ktorá sa môže medzi plsťami rôznych výrobcov líšiť. Keďže výrobcovia plstí toto číslo neuvádzajú, musíme si ho zmerať sami. Preto sme postavili špeciálne testovacie […]

EXPERIMENTAL DETERMINATION OF THE PERMEABILITY-CONSTANT OF THE FELT

In a classic stack with flow-through design, the electrode felt has a significant share on the pressure drop of the battery stack. For simulating the flow through these electrodes, the permeability constant is needed. This number is a material constant, which can vary between felts of different manufacturers. As the felt manufacturers don’t provide this […]

Kysucké Nové Mesto

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK1- Kysucké Nové Mesto 1,5 2,4 BESS Delivery, Ancillary services 03/2024
INO-HUB Energy SK2- Kysucké Nové Mesto 2,0 2,4 BESS Delivery, Ancillary services 03/2025

Nováky

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 55,0 BESS Delivery 02/2026

Košice

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK3 Košice 8,0 10,4 BESS Delivery, Ancillary services 12/2025

Hungary

BESS in tender:

CustomerMWMWhProvided service
N/A3,215,0BESS Delivery, Ancillary services
Other Projects 50,0BESS Delivery, Ancillary services, Flexibility
Summary values 65,0 MWh 

Czech Republic

BESS in tender:

CustomerMWMWhProvided service
N/A8,010,0Delivery and operation of BESS
Summary values 10,0 MWh 

Šaľa

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 6,0 7,6 BESS Delivery 11/2025