BEST CANDIDATES FOR ORFB

Image source: http://www.ttk.mta.hu/

TTK, Budapest, Hungary

After the first meeting, different synthetic routes were planned to afford new viologens and anthraquinones derivatives. R&D team (Igor Derr and Juan Asenjo) visit TTK to check the new results. Promising results in the synthesis of various electrolytes were accomplished and now these materials must be tested in single-cell to corroborate the stability and efficiencies. 

Viologens: Breaking the symmetry of the 4,4’-bipyridinium derivatives will increase the solubility and the stability avoid the formation of aggregates. Furthermore, different derivatives have been synthetized trying to analyze the effect of solubilizing groups in the stability. 

Quinones: The synthesis of new quinone derivatives have been studied trying to use the RFB as an electrochemical reactor to afford the final redox active material directly in the battery. 

Hydroquinone: These new catholytes could be used for the storage of two electrons in the catholyte for the first time in the literature. 

The synthetized materials will be electrochemically evaluated using cyclic voltammetry and rotatory disk electrode measurements to calculate important parameters such as the redox potentials, the kinetic constants and the diffusion coefficients. Finally, other anolytes and catholyte synthesis were depicted as the following steps. 

Acknowledgement:

This work was supported by the project: IPCEI_IE_FLOW_BESS_012021

Kysucké Nové Mesto

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK1- Kysucké Nové Mesto 1,5 2,4 BESS Delivery, Ancillary services 03/2024
INO-HUB Energy SK2- Kysucké Nové Mesto 2,0 2,4 BESS Delivery, Ancillary services 03/2025

Nováky

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 55,0 BESS Delivery 02/2026

Košice

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK3 Košice 8,0 10,4 BESS Delivery, Ancillary services 12/2025

Hungary

BESS in tender:

CustomerMWMWhProvided service
N/A3,215,0BESS Delivery, Ancillary services
Other Projects 50,0BESS Delivery, Ancillary services, Flexibility
Summary values 65,0 MWh 

Czech Republic

BESS in tender:

CustomerMWMWhProvided service
N/A8,010,0Delivery and operation of BESS
Summary values 10,0 MWh 

Šaľa

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 6,0 7,6 BESS Delivery 11/2025