GET THE STACK READY FOR MASS-PRODUCTION

While at the beginning of our prototyping phase we were focused on developing a stack with high performance regarding round trip efficiency, we now have to turn the spotlight also on the requirements of mass production. This involves several challenges:

  • Materials must be chosen that are both cheap and high quality. Therefore, the market needs to be screened, and several samples need to be tested in our lab to be able to select the best products available.
  • The customized parts of the stack like frames, distribution-plates or endplates must be produced in a way that is suitable for mass production. For this reason, we are working on producing these parts by injection molding, which is the cheapest and most efficient way of production for a large number of pieces.
  • The stacking process needs to be adapted. We are working on simplifying the placing of the stack components during stacking by introducing fixing rods and improving fixing structures in the frames.

All these steps bring us closer to a stack that is suitable for mass production.

ACKNOWLEDGEMENT:

This work was supported by the project: IPCEI_IE_FLOW_BESS_012021_2. phase

Kysucké Nové Mesto

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK1- Kysucké Nové Mesto 1,5 2,4 BESS Delivery, Ancillary services 03/2024
INO-HUB Energy SK2- Kysucké Nové Mesto 2,0 2,4 BESS Delivery, Ancillary services 03/2025

Nováky

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 55,0 BESS Delivery 02/2026

Košice

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK3 Košice 8,0 10,4 BESS Delivery, Ancillary services 12/2025

Hungary

BESS in tender:

CustomerMWMWhProvided service
N/A3,215,0BESS Delivery, Ancillary services
Other Projects 50,0BESS Delivery, Ancillary services, Flexibility
Summary values 65,0 MWh 

Czech Republic

BESS in tender:

CustomerMWMWhProvided service
N/A8,010,0Delivery and operation of BESS
Summary values 10,0 MWh 

Šaľa

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 6,0 7,6 BESS Delivery 11/2025