CONNECTING SIMULATION AND REALITY: AORTA+ AND DigiTwin IN PRACTICE

The real power of the platform lies in connecting AORTA+ and DigiTwin into a single comprehensive solution. Together, they create a bridge between the virtual world of simulations and real energy infrastructure.
This makes the process of deploying new solutions significantly safer and more efficient. First, new strategies, algorithms, or configurations are tested in the DigiTwin – digital twin. The system allows you to simulate their behavior in real time and in accelerated mode, compare multiple variants, and evaluate the technical and economic impacts.
Once their functionality has been verified, the same control algorithms are activated directly in AORTA+, which begins to use them to control real devices – battery storage, photovoltaic power plants, cogeneration units, and flexible appliances. Thanks to a unified interface, no additional modification of logic or code is necessary.
This approach enables organizations to innovate faster, reduce risks, and fully exploit the potential of decentralized energy. AORTA+ and DigiTwin thus represent a modern tool for intelligent, secure, and autonomous management of energy systems – from simulation to real operation.

ACKNOWLEDGEMENT:

This work was supported by the project: IPCEI_IE_FLOW_BESS_012021_2. Phase

Kysucké Nové Mesto

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK1- Kysucké Nové Mesto 1,5 2,4 BESS Delivery, Ancillary services 03/2024
INO-HUB Energy SK2- Kysucké Nové Mesto 2,0 2,4 BESS Delivery, Ancillary services 03/2025

Nováky

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 55,0 BESS Delivery 02/2026

Košice

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK3 Košice 8,0 10,4 BESS Delivery, Ancillary services 12/2025

Hungary

BESS in tender:

CustomerMWMWhProvided service
N/A3,215,0BESS Delivery, Ancillary services
Other Projects 50,0BESS Delivery, Ancillary services, Flexibility
Summary values 65,0 MWh 

Czech Republic

BESS in tender:

CustomerMWMWhProvided service
N/A8,010,0Delivery and operation of BESS
Summary values 10,0 MWh 

Šaľa

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 6,0 7,6 BESS Delivery 11/2025