OPTIMIZATION OF THE BATTERY DESIGN – PRESSURE DROP SIMULATIONS

The production of every battery cell, regardless of its size, starts from the inception of models of all components. Then, utilizing modern software, we model the future cell behavior before the actual production of parts and ordering of the materials. The first battery parameter that could be evaluated from the model is the pressure drop of the cell, influenced primarily by the cell design and electrode materials.

To predict the pressure drop of INO-HUB small cells and battery stack, Dr. Natalia Podrojková, our colleague from the University of Pavol Jozef Šafárik in Kosice, undertook a comprehensive review of state-of-the-art literature on battery simulations and prepared several simulation models using Comsol software.

The preparation of simulation models involves the creation of a 2D cell geometry, followed by the transformation into a detailed 3D model. The simulation further encompassed the establishment of laminar flow physics and the creation of a geometry network for laminar flow physics.

Shortly, the simulated data will be compared with experimental values obtained for the small INO-HUB cells and battery stacks to refine and adjust the model, ensuring the accuracy of our battery design.

ACKNOWLEDGEMENT:

This work was supported by the project: IPCEI_IE_FLOW_BESS_012021

Kysucké Nové Mesto

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK1- Kysucké Nové Mesto 1,5 2,4 BESS Delivery, Ancillary services 03/2024
INO-HUB Energy SK2- Kysucké Nové Mesto 2,0 2,4 BESS Delivery, Ancillary services 03/2025

Nováky

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 55,0 BESS Delivery 02/2026

Košice

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK3 Košice 8,0 10,4 BESS Delivery, Ancillary services 12/2025

Hungary

BESS in tender:

CustomerMWMWhProvided service
N/A3,215,0BESS Delivery, Ancillary services
Other Projects 50,0BESS Delivery, Ancillary services, Flexibility
Summary values 65,0 MWh 

Czech Republic

BESS in tender:

CustomerMWMWhProvided service
N/A8,010,0Delivery and operation of BESS
Summary values 10,0 MWh 

Šaľa

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 6,0 7,6 BESS Delivery 11/2025