SMALL SCALE SINGLE CELL QUALITY CONTROL  

We have received membranes, electrodes and bipolar plates for the production of our first prototype stacks.

This material was tested in the lab in a small single cell.

These experiments are necessary to make sure the material is performing according to the specified parameters.

6 experiments have been performed to verify the performance of the new material.

2 different membranes, 2 different bipolar plates and 2 different electrodes have been tested.

Key parameters e.g. the cell resistance including ohmic resistance and charge transfer resistance were evaluated for different setups of material.

All materials have passed the test and can be used in the stack manufacturing.

ACKNOWLEDGEMENT:

This work was supported by the project: IPCEI_IE_FLOW_BESS_012021

Kysucké Nové Mesto

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK1- Kysucké Nové Mesto 1,5 2,4 BESS Delivery, Ancillary services 03/2024
INO-HUB Energy SK2- Kysucké Nové Mesto 2,0 2,4 BESS Delivery, Ancillary services 03/2025

Nováky

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 55,0 BESS Delivery 02/2026

Košice

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK3 Košice 8,0 10,4 BESS Delivery, Ancillary services 12/2025

Hungary

BESS in tender:

CustomerMWMWhProvided service
N/A3,215,0BESS Delivery, Ancillary services
Other Projects 50,0BESS Delivery, Ancillary services, Flexibility
Summary values 65,0 MWh 

Czech Republic

BESS in tender:

CustomerMWMWhProvided service
N/A8,010,0Delivery and operation of BESS
Summary values 10,0 MWh 

Šaľa

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 6,0 7,6 BESS Delivery 11/2025