CHARACTERIZATION OF ORGANIC ELECTROLYTES FOR RFB APPLICATIONS 

After synthesizing a variety of organic electrolytes, the next crucial step is to characterize their electrochemical properties. This includes evaluating parameters such as the kinetic constant, the diffusion rates of charged and uncharged species, and their solubility in water. These factors determine the feasibility of implementing the organic molecules in a redox flow battery (RFB). 

To achieve this, the synthesized molecules were analyzed using Cyclic Voltammetry (CV) and Rotating Disk Electrode (RDE) measurements. These techniques provide valuable insights into the performance and behavior of the electrolytes under operational conditions. 

For an organic electrolyte to be considered promising, it must meet the following criteria: 

  • High solubility in the supporting electrolyte, whether in acidic, neutral, or basic environments. 
  • Appropriate redox potential to maximize the energy density of the RFB. 
  • Chemical and electrochemical stability, preventing degradation or side reactions. 
  • Fast redox kinetics and favorable diffusion coefficients for both redox states. 
  • Sustainability and safe handling, ensuring environmentally friendly and secure use. 
  • Wide operational temperature range, making it suitable for diverse climates. 
  • Cost-effective synthesis, ensuring scalability and economic feasibility. 

Among the various organic electrolytes synthesized during the second phase of the IPCEI project, those that meet these criteria will be further implemented and tested in InoHub’s lab-scale cells to evaluate their real-world performance. 

ACKNOWLEDGEMENT:

This work was supported by the project: IPCEI_IE_FLOW_BESS_012021_2. phase

Kysucké Nové Mesto

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK1- Kysucké Nové Mesto 1,5 2,4 BESS Delivery, Ancillary services 03/2024
INO-HUB Energy SK2- Kysucké Nové Mesto 2,0 2,4 BESS Delivery, Ancillary services 03/2025

Nováky

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 55,0 BESS Delivery 02/2026

Košice

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK3 Košice 8,0 10,4 BESS Delivery, Ancillary services 12/2025

Hungary

BESS in tender:

CustomerMWMWhProvided service
N/A3,215,0BESS Delivery, Ancillary services
Other Projects 50,0BESS Delivery, Ancillary services, Flexibility
Summary values 65,0 MWh 

Czech Republic

BESS in tender:

CustomerMWMWhProvided service
N/A8,010,0Delivery and operation of BESS
Summary values 10,0 MWh 

Šaľa

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 6,0 7,6 BESS Delivery 11/2025