THROUGH EFFICIENT AND ECONOMIC ORGANIC ELECTROLYTES SYNTHESIS 

Previous articles show the importance of discovering new and efficient organic electrolyte which could substitute the poor-available vanadium electrolyte. Even though, vanadium electrolyte presents a really competent price around (5-20 $/L) compromising the economic viability of new organic chemistries. In this sense INO-HUB R&D team and researchers from UPJS are working together in the optimization of the organic synthesis. Here the main approaches to reach this ambitious goal are depicted: 

  • All the organic synthesis must be efficient at large scale (>g scale and kg scale) showing global yields higher than 85 %. To do it a wide scope of the reaction conditions must be studied varying important parameters such as the temperature, solvents, catalysts… 
  • All the synthesis must be eco-friendly using nontoxic solvents/reagents and trying to avoid time consuming purification methods. 
  • High availability and low cost of chemicals required for the synthesis (ideally the cost of the raw materials should not exceed 2 $/kg). Since the main goal of substitute vanadium electrolyte is based in the poor availability of it, the new electrolytes must be produced everywhere. In this sense we need to notice that organic electrolyte price is not going to be comparable until the tons scale will be reached, 
  • Finally, the organic electrolyte must present suitable electrochemical properties such as high voltage, high water solubility (> 2.0 M) and high stability (< 1 % capacity decay/year). 

Seeing all the requirements that the organic electrolytes must fit being produced let us understand the challenging task to be fulfilled by UPJS and INO-HUB.  

ACKNOWLEDGEMENT:

This work was supported by the project: IPCEI_IE_FLOW_BESS_012021

Kysucké Nové Mesto

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK1- Kysucké Nové Mesto 1,5 2,4 BESS Delivery, Ancillary services 03/2024
INO-HUB Energy SK2- Kysucké Nové Mesto 2,0 2,4 BESS Delivery, Ancillary services 03/2025

Nováky

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 55,0 BESS Delivery 02/2026

Košice

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK3 Košice 8,0 10,4 BESS Delivery, Ancillary services 12/2025

Hungary

BESS in tender:

CustomerMWMWhProvided service
N/A3,215,0BESS Delivery, Ancillary services
Other Projects 50,0BESS Delivery, Ancillary services, Flexibility
Summary values 65,0 MWh 

Czech Republic

BESS in tender:

CustomerMWMWhProvided service
N/A8,010,0Delivery and operation of BESS
Summary values 10,0 MWh 

Šaľa

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 6,0 7,6 BESS Delivery 11/2025