AORTA+ : NEW GENERATION SMART ENERGY MANAGEMENT

Today’s energy systems face increasing complexity – rising energy prices, decentralized production, battery storage, and high demands for operational stability. AORTA+ was created in response to these challenges and provides intelligent energy management based on artificial intelligence and advanced optimization algorithms.
The basis of AORTA+ is its ability to predict future consumption and production trends and, on this basis, make advance decisions on the optimal use of available resources. The system analyzes historical data, the current status of equipment, weather forecasts, and market price signals, and is able to adjust its management strategy in real time.
AORTA+ actively manages battery storage, renewable sources, flexible appliances, and energy exchange with the grid. In practice, this means reducing peak consumption, better utilization of local production, cost optimization, and greater stability of the entire energy infrastructure.
A key feature of the solution is its direct integration with real devices. AORTA+ is not just an analytical or monitoring tool—it generates specific control commands that are transmitted directly to physical technologies via standard communication interfaces. As a result, artificial intelligence decisions are immediately reflected in real-world operations.

ACKNOWLEDGEMENT:

This work was supported by the project: IPCEI_IE_FLOW_BESS_012021_2. Phase

Kysucké Nové Mesto

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK1- Kysucké Nové Mesto 1,5 2,4 BESS Delivery, Ancillary services 03/2024
INO-HUB Energy SK2- Kysucké Nové Mesto 2,0 2,4 BESS Delivery, Ancillary services 03/2025

Nováky

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 55,0 BESS Delivery 02/2026

Košice

BESS installed and in the process of installation:
Customer Location MW MWh Provided service Commissioning
INO-HUB Energy SK3 Košice 8,0 10,4 BESS Delivery, Ancillary services 12/2025

Hungary

BESS in tender:

CustomerMWMWhProvided service
N/A3,215,0BESS Delivery, Ancillary services
Other Projects 50,0BESS Delivery, Ancillary services, Flexibility
Summary values 65,0 MWh 

Czech Republic

BESS in tender:

CustomerMWMWhProvided service
N/A8,010,0Delivery and operation of BESS
Summary values 10,0 MWh 

Šaľa

BESS successful in the tender, pending contract signing:
Customer MW MWh Provided service Expected commissioning
N/A 6,0 7,6 BESS Delivery 11/2025